SNA NRJE User/Programmer Reference Manual (30292-90006)
Chapter 2 41
Getting Started
Planning Jobs
on JOB1. The second priority card is transmitted to the host as part of
JOB1 and therefore does not influence JOB2.
When priorities are important, each job should be submitted to SNA
NRJE separately.
Figure 2-3 Priority Card to Job Stream Relationship
Input File Libraries
The job streaming feature of SNA NRJE allows you to construct jobs
from job control cards, programs, and data that already exist in disk
files. You can create libraries of job modules that can be assembled into
a variety of different jobs.
The SNA NRJE user must ensure that
Infiles
and FD files submitted
together constitute a valid job according to host system requirements.
Job Output
Output from a job can be received from a host whenever communication
has been established with a workstation. The default output
destination for the workstation must be a spooled device as configured
in the NMMGR Workstation Data screen.
You can control job output. Chapter 4 , “Job Output,” describes what to
do within a job to route the returning data sets to specific destinations.