HP e3000 MPE/iX Release 6.5 System Software Maintenance Manual (30216-90325)

30 Chapter2
Task Checklists
Checklist A. Manage Patches
not required; proceed to 5.17, “Rerunning HP Patch/iX.”
If the installer utility created a CSLT/
STORE
tape combined, perform
the steps in this section.
5.14 Restarting the System
If the installer utility created a STORE tape only, this section is
not required; proceed to 5.17, “Rerunning HP Patch/iX.”
If the installer utility created a CSLT/STORE tape combined, perform
the steps in this section.
5.17 Rerunning HP Patch/iX
Chapter 6 , “Finishing the Process.
6.1 Configuring Datacomm and UPS
6.4 Setting Passwords, Lockwords, and UDCs
6.7 Performing the Final Reboot
6.8 Restarting Selected System Functions
6.9 Backing Up Your System
6.11 Finishing Up
Checklist A tasks completed.
Record system change:
System name:
System type:
Date change made:
Change performed by:
OS version from:
OS version to:
Comments: