HP e3000 MPE/iX Release 6.0 System Software Maintenance Manual (30216-90272)
Table Of Contents
- Preface
- 1 Introduction
- 2 Task Checklists
- 3 Planning for Your Task
- 4 Preparing Your System
- 5 Modifying Your System
- 6 Finishing the Process
- A Manually Installed Products
- B Configuration Tables
- C Managing Disk Space
- D Backdating Your System
- E CD-ROM Resources
- F HP Patch/iX Reference
- G HP Stage/iX Reference
- H Error Messages and Warnings
- A

58 Chapter3
Planning for Your Task
3.3 CD-ROM Planning Tasks
3.3 CD-ROM Planning Tasks
To plan for CD-ROM related tasks:
1. Review Appendix E , “CD-ROM Resources.”
If you are using the CD-ROM media option and you are new to the process, refer to
Appendix E , “CD-ROM Resources,” for reference information that will help simplify
your task.
2. Plan to log onto a console for Phase 2.
For some phases of the modification process, you can run HPINSTAL from any terminal.
However, messages such as tape requests appear at the console instead of the terminal.
After you shutdown and restart the system, you need to be on the system console.
3. Verify the list of products.
Check your keyword certificate and verify the list of products received and ordered.
Refer to Appendix E , “CD-ROM Resources,” for information on the keyword certificate.
• CD-ROM Planning Tasks completed. Go to the next section on your
checklist.