HP e3000 MPE/iX Release 6.0 System Software Maintenance Manual (30216-90272)

42 Chapter2
Task Checklists
Checklist I. Modify Remote System
Chapter 5 , “Modifying Your System.
5.11 Securing the System
Record terminated logging processes:
Record temporary filename for the COMMAND.PUB.SYS file:
5.13 Applying the CSLT Modification
5.14 Restarting the System
5.16 Rerunning HPINSTAL
Chapter 6 , “Finishing the Process.
6.1 Configuring Datacomm and UPS
6.4 Setting Passwords, Lockwords, and UDCs
6.5 Configuring Manually Installed Products
6.6 Setting Up the TAR Utility
6.7 Performing the Final Reboot
6.8 Restarting Selected System Functions
6.9 Backing Up Your System
6.11 Finishing Up
Checklist I tasks completed.
If you have Reactive patches to apply, proceed to one of these checklists:
Checklist A, “Manage Patches”
Checklist B, “Manage Patches by Staging Area”
Record system change:
System name:
System type:
Date change made:
Change performed by:
OS version from:
OS version to:
Comments: