SNA Link/iX Node Managers Guide (30291-90009)

Table Of Contents
48 Chapter2
SNA Node and Link Configuration
Configuring the SNA Node and Link
Configuring the SNA Node and Link
Once you have opened the configuration file, you are placed at the
NMMGR “Main” screen.
Main Screen
From the screen shown in Figure 2-1, you can select the category of
network subsystems you want to configure.
Figure 2-1 Main Screen
To access the NMMGR branch for configuring an SNA node and link,
press
[f4] (IBM). This places you at the “HP-IBM Configuration” screen.