NetBase for MPE Reference Guide
Disaster Recovery Procedures for NetBase Shadowing Environments
12-3
RUN NBCTRL.PUB.NETBASE;INFO=“CHGDIR newdir”
8. Stop and start the NetBase background job:
RUN NBCTRL.PUB.NETBASE;INFO=“STOP NETBASE”
RUN NBCTRL.PUB.NETBASE;INFO=“START NETBASE”
9. Let users on to the new “master” system.
When it is time to switch back to the original master/shadow configuration, the above steps for a
planned failover would be followed again.