HP e3000 MPE/iX Release 6.0 System Software Maintenance Manual (30216-90272)
Table Of Contents
- Preface
- 1 Introduction
- 2 Task Checklists
- 3 Planning for Your Task
- 4 Preparing Your System
- 5 Modifying Your System
- 6 Finishing the Process
- A Manually Installed Products
- B Configuration Tables
- C Managing Disk Space
- D Backdating Your System
- E CD-ROM Resources
- F HP Patch/iX Reference
- G HP Stage/iX Reference
- H Error Messages and Warnings
- A

42 Chapter2
Task Checklists
Checklist I. Modify Remote System
Chapter 5 , “Modifying Your System.”
— 5.11 Securing the System
Record terminated logging processes:
Record temporary filename for the COMMAND.PUB.SYS file:
— 5.13 Applying the CSLT Modification
— 5.14 Restarting the System
— 5.16 Rerunning HPINSTAL
Chapter 6 , “Finishing the Process.”
— 6.1 Configuring Datacomm and UPS
— 6.4 Setting Passwords, Lockwords, and UDCs
— 6.5 Configuring Manually Installed Products
— 6.6 Setting Up the TAR Utility
— 6.7 Performing the Final Reboot
— 6.8 Restarting Selected System Functions
— 6.9 Backing Up Your System
— 6.11 Finishing Up
Checklist I tasks completed.
If you have Reactive patches to apply, proceed to one of these checklists:
• Checklist A, “Manage Patches”
• Checklist B, “Manage Patches by Staging Area”
Record system change:
System name:
System type:
Date change made:
Change performed by:
OS version from:
OS version to:
Comments: