HP e3000 MPE/iX Release 6.0 System Software Maintenance Manual (30216-90272)

Chapter 2 27
Task Checklists
Checklist B. Manage Patches by Staging Area
Checklist B. Manage Patches by Staging Area
Use this task checklist if your source material is on tape and/or electronically downloaded
files, you are managing your patches, and you are using a staging area on disk to apply:
PowerPatch patches
Reactive patches
PowerPatch and Reactive patches together
NOTE
Not all patches are stageable. For more information, refer to item 19 in
section 3.2, “General Planning Tasks.
Print a copy of this checklist for each system that you are applying patches to.
Read and perform the steps only in the following sections:
Begin Preparation Tasks.
Does not require exclusive access to the system.
Chapter 3 , “Planning for Your Task.
3.1 Verifying Required Materials
3.2 General Planning Tasks
3.4 Checking Tape Media
3.6 Estimating Disk Space
Record contiguous disk space:
Record non-contiguous disk space:
Chapter 4 , “Preparing Your System.
4.1 Reserving Disk Space for Tape Tasks
4.4 Initializing HP Stage/iX
4.7 Starting the Patch Management Tools
4.8 Selecting HP Patch/iX Activities
4.9 Viewing Patches—
Optional
4.10 Qualifying Patches
4.11 Creating a Patch Tape or Staging Area
Record manually installed products:
Chapter 5 , “Modifying Your System.
5.10 Setting a Staging Area
Preparation Tasks completed.
Schedule downtime for exclusive access.
Begin Exclusive Access Tasks.