HP e3000 MPE/iX Release 6.0 System Software Maintenance Manual (30216-90272)

158 Chapter6
Finishing the Process
6.11 Finishing Up
6.11 Finishing Up
Perform the steps in this section for all checklists.
To perform the closing steps of your task:
1. The system is ready for normal production.
2. Display the first part of the HPSWINFO file to confirm the SUBSYS, PowerPatch, and
Date code:
:PRINT HPSWINFO
3. Record the date and release of the System Installation, Update, Add-on, and Patch in
the system log book, as appropriate. If you added subsystem products, note them in the
log book including the release.
4. Record system change information on your task checklist.
Finishing Up completed.