Instruction Manual
Installation 10
Installing the MCS-200
WARNING: The MCS-200 unit and rack are shipped together on a heavy duty shock pallet
weighing approximately 1600 kg (3600 lb). HP recommends hiring professional movers to move
the heavy duty shock pallet, remove the MCS-200 unit and rack from the pallet, and move the
MCS-200 unit and rack to the final location.
CAUTION: Contaminated water might cause decreased cooling capacity or disruption in
service. The water flowing into the MCS-200 unit must meet the guidelines stated in the HP
Modular Cooling System 200/100 Site Preparation Guide. The MCS-200 warranty does not
cover damage caused by contaminated water.
IMPORTANT: Because the MCS-200 unit consumes a large quantity of water, do not operate the
MCS-200 unit from a public water system such as one that supplies drinking water. For water
conservation purposes, to cool the MCS-200 unit, use only recycled water systems.
IMPORTANT: Before you begin the installation process, review the HP Modular Cooling System
200/100 Site Preparation Guide.
1. Install the HP Modular Cooling System Hook Up Kit.
2. Read the unpacking instructions on the MCS-200 packaging material.
3. Using four or more people, remove the MCS-200 unit and rack from the pallet.
4. Roll the MCS-200 unit and rack to the final location.
WARNING: To avoid tipping the MCS-200 unit over, make sure the leveling feet are lowered
when the MCS-200 is equipped, serviced, and operated.
5. To adjust the leveling feet and level the MCS-200 unit, use a bubble level.










