Installation guide

Chapter 8 Installing the HP NetServer in the HP Rack System/E or Rack System/U
90
Installing Bezel Rack Nuts
Facing the front of the rack:
1. Install the bezel-latch rack nuts on the right front column (holes 11 and 15
up from the baseline).
2. Install the bezel-hinge rack nuts on the left front column (holes 6 and 19 up
from the baseline).
Top is 8
EIA units from
the baseline.
Baseline
Template
Install the bezel latch
rack nuts at the
11th and 15th holes
up from the baseline
(front right column).
Install the bezel hinge
rack nuts at the
6th and 19th holes
up from the baseline
(front left column).
Front
Figure 8-4. Marking the Columns for Rack Nuts