- Hewlett-Packard User Guide Printer LCS60
Table Of Contents
- TR.PDF
- 1.PDF
- 2.PDF
- Hardware Installation
- Introduction
- Site Preparation
- Assembly
- Installing the LCS60
- Rack Mounting
- Wall Mounting
- Table-Top Mounting
- Connecting the System Console
- Direct Connection to the LCS60
- Connection through a Data Switch
- Connection through Modems
- Connection through StarKeeper II NMS
- Connecting the Fiber Interface
- Configuration of the Lucent Technologies Data Switch ± LCS60
- Power and Grounding
- Verify LCS60 Console Connection
- Verify Fiber Connection
- Configure the LCS60
- LAN Connections
- Hardware Installation
- 3.PDF
- 4.PDF
- 5.PDF
- 6.PDF
- 7.PDF
- 8.PDF
- Administration
- Basics
- Logging On
- lcsadm Interface
- Typical Administrative Tasks
- Backup and Restore Operations
- Network Access Password Option
- Status
- Error Messages
- Administration
- 9.PDF
- 10.PDF
- 11.PDF
- 12.PDF
- 13.PDF
- 14.PDF
- 15.PDF
- 16.PDF
- IX.PDF

Hardware
Introduction
Table 2-1: Controls and Indicators
_ _____________________________________________________________________
Controls
_ _____________________________________________________________________
Location Switch Function
_ _____________________________________________________________________
Rear Panel Power Power ON/OFF
_ _______________________________________________________
SYSTEM RESET Processor and VME bus reset
_ _____________________________________________________________________
MVME197 ABORT Aborts program, returns to debugger
_ _______________________________________________________
RESET
Processor and VME bus reset
_ _____________________________________________________________________
Indicators
_ _____________________________________________________________________
Board Indicator Function
_ _____________________________________________________________________
MVME197 FAIL Hardware failure
_ _______________________________________________________
SCON Indicates 197 board
is VME bus controller
_ _______________________________________________________
RUN Processor run state
_ _______________________________________________________
LAN LAN status
_ _______________________________________________________
VME VME status
_ _______________________________________________________
SCSI SCSI status
_ _____________________________________________________________________
MVME712M ETHERNET XCVR Ethernet Transceiver
PWR STATUS* power status (amber)
_ _______________________________________________________
SCSI TERM SCSI terminator
PWR STATUS* power status (green)
_ _____________________________________________________________________
_ _____________________________________________________________________
*Can be seen by means of the rear panel cutout labeled SCSI INTERFACE.
Site Preparation
LCS60 specifications for the power, interface, and operating requirements, as
well as the other pertinent interface specifications, are listed in Table 2-2.
2-2 Issue 3










