User Manual
2-10
Installing the Series 4100GL Switches
Installation Procedures
Installing the Series 4100GL
Switches
Once the power supply is installed, make sure you tighten the four retaining
screws that hold it in place. The screws can be tightened with either a flat-
bladed or Torx T-10 screwdriver. Be careful not to overtighten the screws.
Insert the power supply into the
opening, then slide it all the way in
until it connects to the switch. The
power supply face plate will be
flush with the back face of the
switch.
tighten the four screws
stingray.book Page 10 Sunday, March 24, 2002 1:54 AM










