Specifications

4. Align the mezzanine connector on the option card with the mezzanine connector on the
system board.
5. Install the mezzanine card. Press down on the connector to seat the card:
CAUTION: To prevent damage to the server blade, apply pressure over the mezzanine
connector when installing the mezzanine card. Do not apply pressure to the edges of the
card.
6. Install the access panel (“Replacing the access panel”).
7. Install the server blade (“Installing the server blade into the enclosure”).
8. If necessary, install the SBL (“Installing the Scaleable BladeLink”).
9. Power up the server blade (“Powering on the server blade”).
Replacing the access panel
1. Make sure the access panel latch is in the open position (pointing up).
2. Place the access panel onto the server blade by lining up the posts on each side of the access
panel with the keyways on the server blade chassis.
Installing additional components 37