Specifications
Table Of Contents
- HP Integrity BL860c Server Blade User Service Guide
- Contents
- About This Document
- 1 Overview
- 2 General Site Preparation Guidelines
- 3 Installing the Server Blade Into the Enclosure
- Safety Information
- Installation Sequence and Checklist
- Unpacking and Inspecting the Server Blade
- Installing Additional Components
- Installing and Powering On the Server Blade
- Accessing the Integrated Lights Out 2 Management Processor
- Configuring the iLO 2 MP
- Accessing EFI or the OS from iLO 2 MP
- Server Blade to Enclosure Interface
- LAN / NIC Configuration
- Configuring the HP 2 Internal Port SAS Host Bus Adapter
- Verify and Install the Latest Firmware
- 4 Booting and Shutting Down the Operating System
- 5 Troubleshooting
- Methodology
- Troubleshooting Tools
- Errors and Error Logs
- Supported Configurations
- Troubleshooting Processors/Memory/SBA
- Enclosure Information
- Cooling Subsystem
- Troubleshooting Communications Modules
- Troubleshooting Management Subsystem
- Firmware
- Troubleshooting the Server Interface (System Console)
- Troubleshooting the Environment
- Reporting Your Problems to HP
- 6 Removing and Replacing Components
- Service Tools Required
- Removing and Replacing a Hot-Plug SAS Disk Drive
- Preparing the Server Blade for Servicing
- Removing and Replacing the Server Blade from the Enclosure
- Removing and Replacing the Server Blade Access Panel
- Removing and Replacing Internal Components
- Removing and Replacing DIMMs
- Removing and Replacing a Processor
- Removing and Replacing the SAS Backplane
- Removing and Replacing the Front Display Assembly
- Removing and Replacing the Server Battery
- Removing and Replacing the Mezzanine Cards
- Removing and Replacing a Cache Module
- Removing and Replacing the Low Profile Battery Backed Write Cache (BBWC) Battery
- Removing and Replacing the Trusted Platform Module
- Removing and Replacing the System Board
- A Parts Information
- B Server Upgrades
- C Utilities
- NVRAM Backup Utility
- Extensible Firmware Interface
- EFI/POSSE Commands
- Specifying Parameters
- Using the Boot Option Maintenance Menu
- Integrated Lights Out 2 Management Processor
- Index

Figure 25 Connecting the SUV Cable to the Server Blade
Connecting a Terminal to the Server Blade
To establish a connection from your server to your terminal (or emulator device):
CAUTION: Disconnect the SUV cable from the port when not in use. The port and connector are
not intended to provide a permanent connection.
1. Connect the standard DB9f to DB9f modem eliminator cable to the RS-232 port on the SUV
cable. See Figure 26.
Figure 26 Serial Connector on the SUV Cable
2. Connect the other end of the DB9f to DB9f modem eliminator cable to your terminal device.
For more information about iLO 2 MP functions, see the HP Integrity iLO 2 Operations Guide.
3. Verify that the parameters for RS-232 serial port communication are set to the following values
on your terminal or emulator device:
• VT 100 protocol
• 8/none (parity)
• 9600 baud
• None (receive)
• None (transmit)
Accessing the Integrated Lights Out 2 Management Processor 43