Backing up and Restoring HP Insight Management 7.0 Central Management Server (Windows)
67
Matrix infrastructure orchestration section
During this section the restored Matrix infrastructure orchestration database is updated. In
the first phase, the mxsync tool analyzes the scheduled, pending approval, or in-progress
requests. To prevent the HP Matrix infrastructure orchestration service from attempting to
restart requests that may have already completed during the execution step of this phase,
the mxsync tool terminates requests that were in progress when the backup was taken or
scheduled to run before the restore. The list of requests to be terminated is displayed during
the analysis step.
During the second phase, you are asked to identify services that were deleted after
backup. To help with this effort, the mxsync tool creates a file,
<SIM>\mxsync\data\InfrastructureServices.txt, containing a list of the infrastructure
orchestration services defined in the restored database. Prior to performing the execution
step, you are asked to edit the generated file and mark with an askterisk (*) the services
that were deleted. The modified InfrastructureServices.txt file is shown in Figure 10.
+-----------------------------------------+
| Section 4 of 5 |
| HP Matrix infrastructure orchestration |
+-----------------------------------------+
Terminate active requests, remove deleted services, and update allocated IP
addresses.
**** Analysis: Terminate active requests. ****
**** Section 4 of 5, phase 1 of 3 ****
HP Matrix infrastructure orchestration requests that were in-progress when the
backup was taken, or scheduled to run before the restore, will be terminated.
This will prevent HP Matrix infrastructure orchestration from resuming requests
that may have already completed.
Checking for active requests.............................................[OK]
CREATE for S104_VM_TEST is PAUSED_FOR_OS_DEPLOYMENT..................[ACTION]
ISSUE: HPIO requests that are in an active state may cause
undesirable results if they are resumed on HP Matrix
infrastructure orchestration restart. Requests
scheduled for a future date will be preserved.
RESOLUTION: 1 request(s) will be terminated.
Analysis summary:
2 checks performed
1 action needed
0 actions require input
0 advisories
0 errors
Analysis completed successfully. You can choose to execute synchronization
actions now, or stop the synchronization process. If the synchronization
process is stopped, it can be restarted later.
>>> Would you like to perform the actions now? (Y/N): y
**** Execution: Terminate active requests. ****
**** Section 4 of 5, phase 1 of 3 ****
Terminating CREATE request for service S104_VM_TEST......................[OK]
Execution summary:
1 action performed
0 advisories
0 errors
>>> Please press [ENTER] to continue: