Administrator's Guide
Installing HyperFabric
Installing HyperFabric Switches
Chapter 366
Step 10. Once the power is on, check these LEDs on the integrated Ethernet
management LAN adapter card (in the top slot of the switch):
✓ The “Operating/Fault” LED shows solid green.
✓ The “Power A” and “Power B” LEDs show solid green.
✓ The “Ethernet Port Main” and “Ethernet Port Aux” LEDs are
showing solid green (connected) or flashing green (Ethernet traffic is
flowing to the switch). See Figure 3-2 or Figure 3-3 below for the
locations of the LEDs.
Step 11. On the integrated 8-port fiber card (in the middle slot of the switch),
check that for each switch port that is connected to an HF2 adapter, the
LED on the port shows as solid green (see Figure 3-2 on page 59 or
Figure 3-3 on page 60). This means the connection is operational.
Step 12. On the switch module in the expansion slot (the bottom slot of the
switch), check that for each switch port that is connected to a
HyperFabric adapter, the LED on the port shows as solid green (see
Figure 3-2 on page 59 or Figure 3-3 on page 60). This means the
connection is operational.
For more information about the switch’s LEDs, see “HF2 Switch LEDs”
on page 148.
Step 13. If you want to install another HF2 switch without using the rail kit, go to
step 1.
If you want to install another HF2 switch using the rail kit, go to “With
the Rail Kit” on page 61.
Otherwise, go to Chapter 4, “Configuring HyperFabric,” on page 67.