HP StorageWorks XP20000 Disk Array Site Preparation Guide (AE190-96002, September 2007)
Site preparati
on
time allowances
The following site prep tasks may require several weeks:
• Acquiring requ
ired power connectors
• Arranging for an electrician
• Adding or modifying air conditioning systems
• Making buildi
ng
alterations
• Placing an order for data comm equipment
The time between placing an equipment order and actual delivery can vary. Contact your HP
representat
ive to determine the best estimated delivery dates.
14
Site preparation team and tasks