HP StorageWorks XP20000 Disk Array Site Preparation Guide (AE190-96002, September 2007)

5. Checklist items that require a “Yes answer are marked with asterisks (*). If you answer “No” to any
of these items, your site does not meet site requirements for the disk array. Using the information in
Chapter
2, c orrect the site environment so that you can answer “Yes for each of these items.
6. When your site meets all site requirements, contact your HP Service Representative to coordinate
delivery of the disk array equipment.
7. If you choose to unpack the equipment car tons without HP supervision, follow the instructions in
Chapter
3.
8. Contact the HP ServiceRepresentativetoschedulediskarray installation andconguration.
Site preparation checklist
Checklist items that require a “Yes” answer are marked with asterisks (*). The customer summary
informatio
n
is included for the benet of HP representatives, who will help you complete the checklist.
Customer sum ma ry
Customer:
Date:
Address:
Contact:
Phone:
HP summar y
HP SR:
Phone:
HP representative:
Phone:
Asterisk Safety Yes No Reference
Is there a
re protection system in the
computer r
oom?
Fire safety,page 21
*
Is thecomputerroom freeofany
equipment servicing hazards (for
example, electrical or data cables that
obstruct access)?
Equipment servicing hazards, p age 22
Is the existing oor plan documented?
The space planning process, page 22
Has a new
oor
plan been developed
to
inclu
de the
new array?
The space planning process, page 22
*
Does the new oor plan include
adequate space for airow and
servicing needs?
Floor clearance and cutout
dimensions, page 23
*
Does the new oor plan include the
clearance required for the oor’s load
rating?
Floor clearance and cutout
dimensions, page 23
*
Is the computer room structurally
complete (walls, oor, air conditioning
system, and so on)?
General computer room
requirements, page 20
Air conditioning,page 24
*
Is the raised oor adequate for th e
equipment load?
Raised oor requirements, page 22
Is antistatic ooring or mats installed?
Preventing electrostatic
discharge, page 21
Are th
ere cutouts or channels for cable
rout
ing?
Floor clearance and cutout
dimensions, page 23
*
Is there a dedicated analog telephone
line for phone home” conguration?
Data comm requirements, page 28
12
Site preparation team and tasks