HP StorageWorks XP24000 Disk Array Site Preparation Guide, v01 (AE131-96002, June 2007)

E
earth ground requirements, 43
electrical interference, 45
electrical requirements, 42
electrical specifications, 47
electromagnetic interference, 45
electrostatic discharge. See ESD, 22
environmental requirements, 33, 41
equipment servicing hazards, 23
ESD, 22, 34
F
fault tolerant power connections, 44
fire safety, 23
floor
clearance, 27
conductive, 23
covering, 24
cutouts, 25, 27
grid panels, 24
grounding, 23, 24
load rating, 24
plan, 27
tiles, and metallic particulate contamination,
40
waxed, 23
frequency, 42
G
grid panels, floor, 24
grounding, 43, 44
grounding requirements, 43
H
hazards, servicing, 23
heat dissipation, 36
help, 11, 13, 13
HP
technical support, 11
HP representatives
and airborne contaminants, 40
and building construction, 27
and Continuous Track, 41
and electrical requirements, 42, 42
and electromagnetic interference, 45
and equipment delivery, 17, 61
and equipment unpacking, 61
and network security, 41
and power connections, 53, 54, 56, 57
and power line transients, 45
and site safety, 23
and the site prep checklist, 14
and the site prep team, 13, 13
HP SR, 13, 13, 61, 62
humidity, 34
and ESD, 22
I
internet-based remote support, 9, 41, 42
L
LAN connection, 41
lightning, 45
line voltage, 42
M
mechanical vibration specifications, 35
metallic particulate contamination, 40
moisture, 22
N
noise level, 36
O
operating voltages
30-amp single-phase DKC
operating voltages, 48
30-amp single-phase DKU
operating voltages, 51
30-amp three-phase DKC
operating voltages, 49
30-amp three-phase DKU
operating voltages, 52
50-amp single-phase DKC
operating voltages, 47
50-amp single-phase DKU
operating voltages, 50
74