HP XP P9000 for Business Continuity Manager Software User Guide (T5253-96081, July 2013)
• YKMAKE HOLD
• YKEWAIT GOTO(HOLD)
8. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation Startup Procedure” (page 438).
9. Use Remote Web Console to set a Delta Resync control path required for each copy pair.
Operation is returned to normal.
Operating Procedure During a Path Failure Between the Primary Storage System and
the Local Storage System
The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.
Preparing
To prepare for maintenance:
1. Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.
464 Maintenance and troubleshooting operations