HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

Figure 138 Copy group configuration example
In this example, Business Continuity Manager on the Primary site executes all copy group operations.
Status before operation (initial status):
Continuous Access Journal Z copy group: SIMPLEX.
Business Copy Z copy group: SIMPLEX.
Description of operation:
1. Load a copy group.
2. Make a Continuous Access Journal Z copy pair.
3. Suspend a Continuous Access Journal Z copy pair.
4. Make a Business Copy Z copy pair.
5. Suspend a Business Copy Z copy pair.
6. Resynchronize a Continuous Access Journal Z copy pair.
Status after operation:
Continuous Access Journal Z copy group: DUPLEX.
Business Copy Z copy group: SUSPOP.
Loading a copy group
To load a copy group:
1. Display the Main Menu panel and choose 6 Manage Copy Groups.
The Manage Copy Groups panel displays. (Copy pair status: NOT LOADED)
2. Specify l in the AC column to load copy groups GRP1UR and GRP2RSI.
Manage Copy Groups Row 1 to 13 of 19
Command ===> Scroll ===> PAGE
2008/03/04 11:59:48
Supported actions: l(Load), q(Query), m(Make), u(sUspend), r(Resync),
d(Dissolve), w(Watch), e(Ewait), c(reCover), v(query Verify), f(query Fast)
Operating copy groups 667