HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
7. From the primary site, execute the YKRESYNC DELTAJNL command for the primary-to-remote
EXCTG.
• YKQUERY
• YKRESYNC DELTAJNL
• YKEWAIT GOTO(DUPLEX)
When command execution succeeds, the status of the local-to-remote Cnt Ac-J Z copy pair
automatically changes to HOLD (Delta Resync pair).
Operation returns to normal.
Operating procedure during a path failure between the primary site storage system
and the local site storage system
The following are the procedures that must be performed when a path failure occurs between the
primary site storage system and the local site storage system.
586 Maintenance and troubleshooting operations