HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
6. Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.
7. From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.
• YKQUERY
• YKRESYNC
• YKEWAIT GOTO(DUPLEX)
Operation is returned to normal.
Operating procedure during a path failure between the primary site storage system
and the intermediate site storage system
The following are the procedures to be performed when a path failure occurs between the primary
site storage system and the intermediate site storage system.
532 Maintenance and troubleshooting operations