HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
7. Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.
8. From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.
• YKQUERY
• YKRESYNC
• YKEWAIT GOTO(DUPLEX)
Operation is returned to normal.
Operating procedure during an intermediate site storage system failure (with
information lost from memory)
The following are the procedures to be performed when the intermediate site storage system is in
a volatile failure state.
Using a 4x4x4 Cascade Configuration 517