HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
Preparing
1. From the primary site, execute the YKSUSPND command for the Continuous Access Journal Z
EXCTG.
• YKQUERY
• YKSUSPND
• YKEWAIT GOTO(SUSPEND)
2. Start remote site storage system maintenance.
Change the configuration to a 2DC configuration in which operation is performed from the
primary site.
Using a 4x4x4 Cascade Configuration 503