HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

YKMAKE HOLD
YKEWAIT GOTO(HOLD)
8. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation startup procedure” (page 458).
9. Use Remote Web Console to set a Delta Resync control path required for each copy pair.
Operation is returned to normal.
Operating procedure during a path failure between the primary storage system and
the local storage system
The following are the operating procedures taken when a path between the primary storage system
and the local storage system is in failure state.
Preparing
To prepare for maintenance:
1. Use TPC-R on the primary host to stop Cnt Ac-S copy pairs with the HyperSwap attribute.
484 Maintenance and troubleshooting operations