HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

3. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation startup procedure” (page 458).
4. Use TPC-R on the primary host to execute HyperSwap.
The copy direction of Cnt Ac-S copy pairs with the HyperSwap attribute is reversed, and the
groups are moved from the DUPLEX status to the SWAPPING status.
5. Detect HyperSwaps of the Cnt Ac-S copy pairs with the HyperSwap attribute, and check the
statuses of the copy groups.
YKQUERY
6. On the primary host, execute the YKSUSPND FLUSH command for Cnt Ac-J Z copy pairs
between the local storage system and the remote storage system.
462 Maintenance and troubleshooting operations