HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
Preparing
• From the primary site, execute the YKSUSPND FORWARD command for the Continuous Access
Synchronous Z copy pair.
• YKQUERY
• YKSUSPND FORWARD
• YKEWAIT GOTO(SUSPEND)
Change the configuration to a 2DC configuration in which operation is performed from the
primary site.
Recovering
1. Recover the path failure.
Using a Delta Resync Configuration 447