HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

YKQUERY
YKMAKE HOLD
YKEWAIT GOTO(HOLD)
5. Use Remote Web Console to reconfigure the delta resync control paths required between the
Primary Local and Primary Remote sites.
6. Stop operation at the local site.
7. From the primary site, execute the YKSUSPND FLUSH command for the Continuous Access
Journal Z copy pair between the local site and the remote site.
YKQUERY
YKSUSPND FLUSH
YKEWAIT GOTO(SUSPEND)
432 Maintenance and troubleshooting operations