HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
• YKQUERY
• YKMAKE HOLD
• YKEWAIT GOTO(HOLD)
5. Use Remote Web Console to reconfigure the delta resync control paths required between the
Primary → Local and Primary → Remote sites.
6. Stop operation at the local site.
7. From the primary site, execute the YKSUSPND FLUSH command for the Continuous Access
Journal Z copy pair between the local site and the remote site.
• YKQUERY
• YKSUSPND FLUSH
• YKEWAIT GOTO(SUSPEND)
432 Maintenance and troubleshooting operations