HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

3. Start operation at remote site 1.
Operation in a 2DC configuration is performed between remote site 1 and the primary site.
Failback
1. Recover the host at the primary site from the failure.
2. Stop operation at remote site 1.
3. From the primary site, execute the YKSUSPND FORWARD command for the Continuous Access
Journal Z copy pair between the primary site and remote site 1.
YKQUERY
YKSUSPND FORWARD
YKEWAIT GOTO(SUSPEND)
Using a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration 405