HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
Figure 123 Operational Testing (2/2)
NOTE: When performing operational testing, remember the following:
• A real disaster might take place while performing operational testing.
• Operational testing must take place on the secondary site only after the copy pair is suspended
(SUSPOP status).
Backup operations using the Cnt Ac-J Z ATTIME Suspend function
This section describes backup operations that use the Cnt Ac-J Z ATTIME suspend function.
The following figure provides a legend for the figures relating to operating procedures in this
section:
Status During Normal Operations
During normal operations, place the Cnt Ac-J Z copy pair in the DUPLEX status and the BC Z copy
pair in the SUSPOP status. Suppose that there are two BC Z generations. In this case, the Business
Backup operations using the Cnt Ac-J Z ATTIME Suspend function 319