HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

Figure 123 Operational Testing (2/2)
NOTE: When performing operational testing, remember the following:
A real disaster might take place while performing operational testing.
Operational testing must take place on the secondary site only after the copy pair is suspended
(SUSPOP status).
Backup operations using the Cnt Ac-J Z ATTIME Suspend function
This section describes backup operations that use the Cnt Ac-J Z ATTIME suspend function.
The following figure provides a legend for the figures relating to operating procedures in this
section:
Status During Normal Operations
During normal operations, place the Cnt Ac-J Z copy pair in the DUPLEX status and the BC Z copy
pair in the SUSPOP status. Suppose that there are two BC Z generations. In this case, the Business
Backup operations using the Cnt Ac-J Z ATTIME Suspend function 319