HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

Post-operation status (normal status)
Cnt Ac-J Z copy group: DUPLEX
BC Z copy group: SUSPOP
Backing Up a Copy Group
To acquire a backup after a copy group operation has started, execute steps 2 through 5 in
“Creating a Copy Group (page 316). In step 3, execute the YKRESYNC command to resynchronize
the BC Z copy group.
Operational Testing
Figure 122 (page 318) and Figure 123 (page 319) show an example operation for performing
operational testing in a 2DC configuration.
Figure 122 Operational Testing (1/2)
318 Using Business Continuity Manager