HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
3. Transfer the scan result from the primary site to the secondary site, and vice versa.
Setting up for performing operations at the primary site
1. Define a path set consisting of the following logical paths on the primary host (or specify the
logical paths by using Remote Web Console).
• Inter-control unit logical paths
Primary storage system → Local storage system◦
◦ Local storage system → Primary storage system
• Inter-disk controller logical paths
Primary storage system → Remote storage system◦
◦ Local storage system→ Remote storage system
218 Configuration definitions