HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

To see the procedure for loading and building a logical path, see “Establishing a logical path
(page 610).
4. From the primary host, register a command device for the storage system of the primary site,
local site, and remote site, in either of the following orders.
The primary site first, followed by the local site, and then the remote site
The primary site first, followed by the remote site, and then the local site
This creates the command device definition file.
For details on how to register a command device in a storage system, see “Registering a
command device in a storage system” (page 639).
Settings for Operations at the Local Site (3DC Multi-Target Configuration)
To set operations at the local site:
Defining a 3DC Multi-Target (Cnt Ac-S Z x Cnt Ac-J Z) configuration 181