HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

Table 51 Required route list (3DC Multi-Target (Cnt Ac-S Z x Cnt Ac-J Z) configuration) (continued)
Route list needed in Business Continuity ManagerRemote site
condition
Local site
condition
Primary site
condition
Host on which Business
Continuity Manager is
started
Local PrimaryUnusableUsableUsable
Local RemoteUsableUsableUnusable
Local
#
Local
#
UnusableUsableUnusable
Remote Primary LocalUsableUsableUsableRemote host
Remote PrimaryUsableUnusableUsable
NoneUsableUsableUnusable
UsableUnusableUnusable
Legend:
Usable: The target site can be used.
Unusable: The target site cannot be used because of an error.
# Required only if the Continuous Access Synchronous Z Consistency Preservation
Function is used.
Table 52 (page 177) shows how to prepare the configuration files at each site.
Table 52 How to Prepare the Configuration Files at Each Site (3DC Multi-Target (Cnt Ac-S Z x Cnt
Ac-J Z) configuration)
How to PrepareContentsFile Type
At the Secondary SiteAt the Local SiteAt the Primary Site
Transfer from the
primary site
Transfer from the
primary site
Perform a local scanThe primary site
configuration
Disk configuration
definition file
Transfer from the local
site
Perform a local scanTransfer from the local
site
The local site
configuration
Perform a local scanTransfer from the
remote site
Transfer from the
remote site
The remote site
configuration
Defining a 3DC Multi-Target (Cnt Ac-S Z x Cnt Ac-J Z) configuration 177