HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)
4. From the intermediate host, register a command device for the storage systems at the
intermediate site, primary site, and remote site.
Steps at the remote site
1. From the remote host, define a path set consisting of inter-disk controller logical paths (Remote
→ Primary, and Remote → Intermediate) (or use Remote Web Console to set up paths).
2. From the remote host, create a route list (Remote → Intermediate → Primary route).
172 Configuration definitions