HP XP P9000 Business Continuity Manager User Guide (T5253-96086, November 2013)

Table 47 How to prepare the configuration files at each site (3DC Cascade (Cnt Ac-J Z x Cnt Ac-J
Z) configuration)
How to prepareContentsFile type
At the remote siteAt the intermediate
site
At the primary site
Transfer from the
primary site
Transfer from the
primary site
Perform a Local ScanThe primary site
configuration
Disk configuration
definition file
Transfer from the
intermediate site
Perform a Local ScanTransfer from the
intermediate site
The intermediate site
configuration
Perform a Local ScanTransfer from the
remote site
Transfer from the
remote site
The remote site
configuration
Not requiredNot requiredDefine a path setAn inter-disk controller
logical path between
the following sites:
Path set definition file
Primary
Intermediate
Primary Remote
Intermediate
Remote
Not requiredDefine a path setNot requiredAn inter-disk controller
logical path between
the following sites:
Intermediate
Primary
Define a path setNot requiredNot requiredAn inter-disk controller
logical path between
the following sites:
Remote
Intermediate
Remote Primary
Not requiredNot requiredDefine a route listA route/command
device between the
following sites:
Primary
Intermediate
Remote
Route list definition file
and command device
definition file
Not requiredDefine a route listNot requiredA route/command
device between the
following sites:
Intermediate
Primary
Intermediate
Remote
Define a route listNot requiredNot requiredA route/command
device between the
following sites:
Remote
Intermediate
Primary
Transfer from the
primary site
Transfer from the
primary site
Define a copy groupA Continuous Access
Journal Z copy group
Copy group definition
file
Defining a 3DC Cascade (Cnt Ac-J Z x Cnt Ac-J Z) configuration 167