HP P9000 Business Continuity Manager User Guide
NOTE: Some of these tasks must be performed for each site in the configuration. For detailed
information, see “Configuration Definitions” (page 126).
Each of the following tasks can be selected from an item on the Main Menu ISPF panel.
• Scan each site to acquire information about the volumes; transfer this information to the primary
site. See “Acquiring volume information” (page 430).
• Define and establish a set of inter-control unit logical paths or inter-disk controller logical paths.
See “Creating a path set” (page 439).
• Define the Route List. See “Defining a route list” (page 457).
• Register a command device in a storage system. See “Setting up Storage Systems” (page 100).
• Define a copy group. See “Defining a copy group” (page 477).
40 Overview of HP P9000 for Business Continuity Manager Software