HP P9000 Business Continuity Manager User Guide
3. Restart the monitoring of HyperSwaps by using Business Continuity Manager.
For details, see “Operation Startup Procedure” (page 350).
4. Use TPC-R on the primary host to execute HyperSwap.
The copy direction of Cnt Ac-S copy pairs with the HyperSwap attribute is reversed, and the
groups are moved from the DUPLEX status to the SWAPPING status.
5. Detect HyperSwaps of the Cnt Ac-S copy pairs with the HyperSwap attribute, and check the
statuses of the copy groups.
• YKQUERY
6. On the primary host, execute the YKSUSPND FLUSH command for Cnt Ac-J Z copy pairs
between the local storage system and the remote storage system.
354 Maintenance and Troubleshooting Operations