HP P9000 Business Continuity Manager User Guide
7. From the primary site, execute the YKRESYNC DELTAJNL command for the delta resync pair.
• YKQUERY
• YKRESYNC DELTAJNL
• YKEWAIT GOTO(DUPLEX)
If the command is successful, the Continuous Access Journal Z copy pair on the local site and
the remote site is automatically moved to the HOLD status (delta resync pair).
Operation is returned to normal.
NOTE: If during operation the status of a delta resync pair changes to HOLDTRNS, NODELTA,
or HOLDER, see “Actions to be Taken When the Delta Resync Function Cannot be Set Up or
Operated Successfully” (page 340).
Operating Procedure During a Path Failure Between the Primary Site Storage System
and the Local Site Storage System
The following explains the procedures to be performed when a path failure occurs between the
primary site storage system and the local site storage system.
338 Maintenance and Troubleshooting Operations