HP P9000 Business Continuity Manager User Guide

Setting up for performing operations at the secondary site
1. Define a path set consisting of the following inter-disk controller logical paths on the secondary
host (or specify the logical paths by using Remote Web Console).
Remote storage system -> Primary storage system
Remote storage system -> Local storage system
2. Define the following route lists on the secondary host.
HSRT3
Remote storage system -> Primary storage system
Remote storage system -> Local storage system
3. Establish an inter-disk controller logical path on the secondary host.
Defining a 2DC configuration with HyperSwap and Cnt-Ac J Z 185