HP P9000 Business Continuity Manager Reference Guide (T5253-96058, September 2011)

Table Of Contents
Table 6 Contents of the Main Menu
DescriptionItem
Verifies the environment settings.0 Installation Verification
Sets the default of a site1 Set Defaults
Manages license information2 Manage Licenses
Scans volumes and defines the configuration file3 Discover/Define Configuration
Manages routes4 Manage Route
Manages logical paths5 Manage Path Set
Operates a copy group6 Manage Copy Groups
Terminates the panel7 Exit
Version of Business Continuity ManagerVersion
When the PF keys are not displayed in the Main Menu panel or the Set Defaults panel, you can
display the PF keys by entering the PFSHOW ON command.
Installation Verification Summary Panel (Environment Settings Verification)
The Installation Verification Summary panel is displayed when the final installation check determines
that the installation of Business Continuity Manager has not completed, or when 0 Installation
Verification is selected from the Main Menu panel (the installation check is performed before the
Main Menu panel is displayed). In the Installation Verification Summary panel, either OK or FAULTY
is displayed for the verification result of the security setting and the user SVC setting.
Figure 12 (page 23) shows the Installation Verification Summary panel.
Figure 12 Installation Verification Summary Panel
Table 7 (page 24) lists and describes the items in the Installation Verification Summary panel.
Specify the item number that corresponds to the operation to be performed.
Installation Verification Summary Panel (Environment Settings Verification) 23