HP XP P9500 Site Preparation Guide (AV400-96609, January 2014)
Location: The specific location in the data center (area or “footprint” on the floor) where the P9500
disk array will be installed.
User Information
.Company
.Address
.Contact
.Phone
.Mobile
.Email
.Contact
.Phone
.Mobile
.Email
HP Information
.Contact
.Phone
.Mobile
.Email
.Contact
.Phone
.Mobile
.Email
.Notes
..
NoYesInstallation Planning Checklist
..Safety Requirements
..Is the data center equipped to protect the equipment from fire?
..Is the data center free of hazards (for example, cables that obstruct access)?
..Delivery Requirements
..Is the receiving area adequate for equipment delivery and unloading? (Can the area handle
crated equipment at least 90 in./2.29 m high?)
..Are all doors, hallways, elevators, and ramps wide enough and high enough to allow the
equipment to be moved from the receiving area to the installation area?
..Can the floors, elevators, and ramps support the weight of the equipment?
..Storage Requirements
..If the equipment will be stored after delivery and prior to installation, does the storage location
meet the environmental requirements for storing a P9500 disk array?
..Facilities Requirements