Platform LSF Administration Guide Version 6.2

Using Historical and Committed Run Time
Administering Platform LSF
306
When a committed run time factor is included in the priority calculation, the dynamic
priority drops as soon as the job is dispatched, rather than gradually dropping as the job
runs: