HP XC System Software Installation Guide Version 3.2

improved availability, 33
service assignment, 213
user account, 82
verifying system health, 115
warnings from OVP, 175
naming conventions, 18
NAT configuration, 60
NAT service, 212
configuring, 93
netboot failure, 171
network connectivity
testing, 111, 113
network mask, 56
network type, 59, 223
configuring, 92
NFS daemon, 59
configuring, 91
NFS server service, 212
NIS configuration, 61
NIS slave server
configuring, 94
no node found, 167
no switch found, 69
node
discovering, 72
imaging problems, 55
in down state, 176
not discovered, 167
roles, 210
node configuration
listing, 215
modifying, 215, 216
modifying roles, 217
node list
condensed, 222
explicit, 222
node management role, 213
node naming prefix, 56, 63
node naming scheme, 54
node numbering, 56
node role (see roles)
node role assignment
default, 209
modifying, 217
node-level switch, 60
configuring, 92
node-list file
for InfiniBand interconnect, 104
nrg command, 115
NTP configuration, 59
NTP server
configuring, 91
O
- -oldmp option, 59
onboard administrator
connecting to, 46
putting on an active network, 46
static IP address for, 46
operation verification program (see OVP)
OVP, 113
failed link error, 175
invoking, 114
log file, 114
Nagios warnings, 175
network_bidirectional test error, 174
qsnet_database test failure, 175
sample command output, 231
troubleshooting, 172
P
PALLAS, 114
parallel distributed shell (see pdsh)
password
BMC/IPMI on HP Integrity systems, 77
configuration and management database, 63
console port devices, 58
database administrator, 63
guidelines, 185
root, 44
patches, 65
PBS Professional
adding nodes, 153
configuration tasks, 152
execution nodes, 153
HP MPI tasks, 155
installation planning, 151
installation process, 152
overview, 151
service daemons, 154
user setup, 154
pdsh
defined, 37
performance
maximizing on compute notes, 204
Permission denied error
during NFS mount operation, 171
PGI compiler, 28, 80
planning
for future HP XC releases, 25
service availability strategy, 28
power on nodes, 100
preupgradesys script, 123
processor architecture, 41
ProCurve switch, 166
does not obtain IP address, 166
ProCurve switch password, 58
program development tools, 80
propagate golden image, 100
Q
qsctrl utility, 175
QsNet
network type, 59
node- and top-level switches, 92
Quadrics interconnect, 59
(see also QsNet)
connecting to the switch monitoring line card, 193
261