HP XC System Software Installation Guide Version 2.1
Table A-1: Installation and Configuration Checklist (cont.)
Task Descrip tion Related Section
Is Task
Complete?
18. Define and set up the system environment before the golden
image is created:
• Configure interconnect switch line monitoring cards
(required)
• Configure sendmail (required)
• Create user accounts (optional)
• Configure NIS (optional)
• Limit user access to compute nodes (optional)
• Customize client node disk partitions (optional)
Section 4.7
19. Run the cluster
_config command to configure the
system and crea
te the golden image.
Section 4.8
20. Modify the SLURM configuration file (optional). Section 4.9
21. Start the system and propagate the golden image to all c lient
nodes.
Section 4.10
22. Start the Load Sharing Facility (LSF HPC). Section 4.11
Verifying the System
23. Run the operation verification program (OVP). Section 5.1
24. Create a basel
ine of the system configuration database for
future use.
Section 5.2
25. Run the sys_check utility. Section 5.3
Optional Conf
iguration Tasks
26. Configure SAN storage devices. Section 6.1
A-2 Installation and Configuration Checklist