ACC SNAplus2 Link Software User's Guide

Chapter 2 27
Software Installation and Verification
Installation Verification
SNA/ACC Software Verification
When it is determined that the ACC Multiplexer hardware and ACC
Base Software are fully operational with no problems, the peer-to-peer
test procedures in this section should be run to verify that the SNA/ACC
installation is correct and the SNAplus2 software can work with it.
The SNAplus2 GUI, shown below (Figure 2-2), is convenient for this
verification phase. If the SNAplus2 software is not running, issue the
following command to manually start SNAplus2:
% /opt/sna/bin/snap start
SNAplus2 Configuration
Run the xsnapadmin program and set items found in the “Services
menu windows (Figure 2-2) per the following steps:
Step 1. Make the following selections under “Configure” in the Node Parameters
window:
Control point name: USHWP01.<host_name>
Control point alias: <host_name>
Node ID: 05F FFFFF
Step 2. Make the following selections under “Connectivity” in the “New Port”
window:
Port using: ACC SDLC card
SNA port name: SDLCP0
ACC SDLC card number: 0
Port number: 0
Initially active: depressed (red)
Line details:
Type: Leased line
Link role: Secondary
Encoding: NRZ
Duplex setting: Half duplex