HP-UX Host Intrusion Detection System Version 4.1 Administrator's Guide
6. Specify the times and days that you want each group in the surveillance schedule
to run. For more information, see “Setting Surveillance Schedule Timetables”
(page 85).
7. Select the Alert Aggregation tab. Configure alert aggregation by following the
steps described under “Configuring Alert Aggregation” (page 88).
8. When your surveillance schedule is complete, it is a good idea to save it to the
disk. For more information, see “Saving a Surveillance Schedule” (page 76).
NOTE: The changes you make to a schedule are not propagated to any agent host
until you activate it from the System Manager screen. If you modify a running schedule,
you need to activate the schedule again to apply the changes.
Renaming a Surveillance Schedule
To rename a surveillance schedule, follow the steps:
1. On the Schedule Manager screen, select the schedule in the Schedules panel.
2. Open the Rename Surveillance Schedule dialog box (Figure 5-4) by performing
one of the following tasks:
• Click the Rename button in the Schedules panel
This only changes the names of the schedule and its disk file. The schedule is
not saved to disk.
• Choose File >Save Selected Schedule As
This changes the schedule and file names, and saves the schedule to the disk.
Figure 5-4 Rename Surveillance Schedule Dialog
3. Edit the name in the input field. Valid characters are alphanumeric and underscore;
the first must be alphanumeric. Schedule names are case-sensitive. If you include
invalid characters, you will be prompted to replace them with underscores.
4. Click OK to change the name. Click Cancel to leave the name unchanged.
Deleting a Surveillance Schedule
This section describes about how to delete a surveillance schedule.
Configuring Surveillance Schedules 75