Resizing partitions automatically with HP-UX Workload Manager
18
xi) Add another group by selecting Add Another Workload Group, and click Next. CPU
allocation choices for the new groups include, but are not limited to:
– A usage goal, which is demonstrated above
– Fixed allocation
– Time-based allocation, in which a workload group gets CPU resources for a specified
period of time. This is described in the white paper, “Getting started with HP-UX
Workload Manager,” available at:
http://www.hp.com/products1/unix/operating/docs/wlm.gettingstarted.pdf
xii) Continue adding workload groups as desired. To keep this procedure brief, the steps for
adding more workload groups are not described here; however, the configuration file
generated by the wizard (and shown later) does include two additional groups (named
Finance and Orders).